Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The University of Wisconsin-Madison is requesting bids for the purchase of a spinner hood.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Fabrication and installation of transit center wayfinding signage.
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Fabrication and installation of transit center wayfinding signage.
AvailableMetal for fabrication.
Posted Date
Nov 25, 2025
Due Date
Jan 7, 2026
Release: Nov 25, 2025
Close: Jan 7, 2026
Metal for fabrication.
AvailableFabrication and Installation of Signages at DFW Airport.
Posted Date
Nov 29, 2025
Due Date
Jan 16, 2026
Release: Nov 29, 2025
Close: Jan 16, 2026
Fabrication and Installation of Signages at DFW Airport.
AvailableWork includes, but is not limited to: a. Design of new slatwall console system for center console. B. Demolition and removal of existing center consoles. C. Fabrication and installation of new center console slatwall, mounts, miscellaneous accessories, and equipment. All consoles are to be secured per the ibc for seismic design (assume i factor 1. 5) d. Installation/relocation of electrical circuits and light switches to the new console. All electrical work must be in compliance with faa specification 1217h and faa-std- 019g. E. Installation of new multipoint ground plates and grounding cabling to each section of the new consoles. F. Provide electronic copies of shop drawings and plans. Drawings and plans must be in autocad. Dwg format. See attached file.
Posted Date
Mar 18, 2025
Due Date
May 15, 2028
Release: Mar 18, 2025
Close: May 15, 2028
Work includes, but is not limited to: a. Design of new slatwall console system for center console. B. Demolition and removal of existing center consoles. C. Fabrication and installation of new center console slatwall, mounts, miscellaneous accessories, and equipment. All consoles are to be secured per the ibc for seismic design (assume i factor 1. 5) d. Installation/relocation of electrical circuits and light switches to the new console. All electrical work must be in compliance with faa specification 1217h and faa-std- 019g. E. Installation of new multipoint ground plates and grounding cabling to each section of the new consoles. F. Provide electronic copies of shop drawings and plans. Drawings and plans must be in autocad. Dwg format. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis