Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
work consist of 11 LF of standard 6" rolled curb and gutter, 92 LF of 6" vertical curb and gutter, 50 LF of concrete valley gutter, 40 SY of concrete sidewalk, 1 EA of pedestrian ramp w/detectable warning, 20 sf of traffic control signs, 2 EA of traffic control barricades, 160 MH of traffic control flaggers, 2 EA of relocate roadside sign, 143 SY of asphalt repair, 29 SY of sod repair, 1 EA of tree trimming, 65 LF of remove and reset sprinkle system. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Aspinwall community park - phase 1 improvements.
Posted Date
Jan 13, 2026
Due Date
Feb 6, 2026
Release: Jan 13, 2026
Close: Feb 6, 2026
Aspinwall community park - phase 1 improvements.
AvailablePedestrian improvements to highway.
Posted Date
Jan 17, 2026
Due Date
Jan 27, 2026
Release: Jan 17, 2026
Close: Jan 27, 2026
Pedestrian improvements to highway.
AvailableProvide bike and pedestrian corridor improvements. Work will include lighting, storm drain, landscape, traffic signal improvements, potential pavement preservation, and other roadway safety measures. Asphalt concrete pavement milling (1" depth) 10,395. 00 sq yd, asphalt concrete pavement milling (2" depth) 1,349. 00 sq yd, subgrade preparation 4,844. 00 sq yd, aggregate base course 753 cu yd, asphalt concrete surface course, type d 1/2 1,751. 00 ton, asphalt concrete surface course, type c 3/4, 3" thick 646 ton, portland cement concrete pavement, class a, 9" thick 1,036. 00 sq yd, emulsified asphalt for tack coat, type ss-1h 24 ton. See outside link or attached files.
Posted Date
Jan 15, 2026
Due Date
Feb 17, 2026
Release: Jan 15, 2026
Close: Feb 17, 2026
Provide bike and pedestrian corridor improvements. Work will include lighting, storm drain, landscape, traffic signal improvements, potential pavement preservation, and other roadway safety measures. Asphalt concrete pavement milling (1" depth) 10,395. 00 sq yd, asphalt concrete pavement milling (2" depth) 1,349. 00 sq yd, subgrade preparation 4,844. 00 sq yd, aggregate base course 753 cu yd, asphalt concrete surface course, type d 1/2 1,751. 00 ton, asphalt concrete surface course, type c 3/4, 3" thick 646 ton, portland cement concrete pavement, class a, 9" thick 1,036. 00 sq yd, emulsified asphalt for tack coat, type ss-1h 24 ton. See outside link or attached files.
Brookfield Lakin LLC, on behalf of the Alamar Community Facilities District in Avondale, Arizona, is soliciting sealed bids to construct waterline improvements for Alamar Phase 5, Phase 1. The work includes installation of a new 16‑inch waterline and related appurtenances along Dysart Road and abandonment of an existing 12‑inch line per City of Avondale requirements. Bids are due February 10, 2026, at 3:00 p.m. local time, with a mandatory pre‑bid meeting set for January 13, 2026.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
Brookfield Lakin LLC, on behalf of the Alamar Community Facilities District in Avondale, Arizona, is soliciting sealed bids to construct waterline improvements for Alamar Phase 5, Phase 1. The work includes installation of a new 16‑inch waterline and related appurtenances along Dysart Road and abandonment of an existing 12‑inch line per City of Avondale requirements. Bids are due February 10, 2026, at 3:00 p.m. local time, with a mandatory pre‑bid meeting set for January 13, 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis