Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for a construction contract involving bituminous surfacing, aggregate base, shoulder base aggregate, milling bituminous surface, plant mixed bituminous pavement, pavement markings, turf establishment, and traffic control.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 96 LF sawing bituminous pavement (full depth); 380 TN aggregate surfacing class 5; 9,996 SY full depth reclamation; 13,840 SY mill bituminous surface (2.0"); 743 GAL bituminous material for tack coat; 600 LF 4" solid line multi-component; 12 LF 24" solid line preform tape ground in; 173 CY excavation - rock; 1,154 TN aggregate surfacing class 5; 22,808 SY full depth reclamation; 2 EA 12" cas pipe apron; 1,127 SF 4" concrete walk; 472 LF concrete curb & gutter design d418; 56 LF wooden fence.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 15, 2026
Work includes 96 LF sawing bituminous pavement (full depth); 380 TN aggregate surfacing class 5; 9,996 SY full depth reclamation; 13,840 SY mill bituminous surface (2.0"); 743 GAL bituminous material for tack coat; 600 LF 4" solid line multi-component; 12 LF 24" solid line preform tape ground in; 173 CY excavation - rock; 1,154 TN aggregate surfacing class 5; 22,808 SY full depth reclamation; 2 EA 12" cas pipe apron; 1,127 SF 4" concrete walk; 472 LF concrete curb & gutter design d418; 56 LF wooden fence.
AvailablePurchase of base course aggregate includes pit-run gravel; stone, crushed limestone and railroad ballast.
Posted Date
Dec 17, 2025
Due Date
Jan 13, 2026
Release: Dec 17, 2025
Close: Jan 13, 2026
Purchase of base course aggregate includes pit-run gravel; stone, crushed limestone and railroad ballast.
AvailablePurchase of aggregate and flexible base material. Includes aggregate, type A and B, grade 3, grade 3S, grade 4, grade 4S, grade 5, and grade 5S and flexible base, type A, grade 1-2, and grade 5. It is anticipated that County will order approx. 11,000 tons of aggregate and 9,000 tons of flexible base during the contract period.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
Purchase of aggregate and flexible base material. Includes aggregate, type A and B, grade 3, grade 3S, grade 4, grade 4S, grade 5, and grade 5S and flexible base, type A, grade 1-2, and grade 5. It is anticipated that County will order approx. 11,000 tons of aggregate and 9,000 tons of flexible base during the contract period.
AvailableSeeking bids for approximately 20,000 tons of crusher run/graded aggregate base.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
Seeking bids for approximately 20,000 tons of crusher run/graded aggregate base.