Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of bid packages: Bp100 - general trades scope, bp0105 final cleaning, bp0390 turnkey concrete, bp0400 turnkey masonry, bp0740 roofing, bp0750 metal panels, bp0790 caulking & waterproofing, bp0800 doors - frames - hardware, bp0836 overhead doors, bp0840 curtainwall - storefronts - glazing, bp0925 metal studs & drywall, bp0960 resilient flooring, bp0964 polished concrete, bp0980 acoustical ceilings, bp0990 painting, bp1000 division 10 specialties, bp1010 signage, bp1065 operable partitions, bp1232 casework, bp2100 fire protection, bp2200 plumbing, bp2300 hvac, bp2600 electrical, bp3231 fences & gates, bp3290 landscaping.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Renovation of the Administration Building - Phase II. General Construction; HVAC Construction; Electrical Construction.
Posted Date
Nov 26, 2025
Due Date
Jan 8, 2026
Release: Nov 26, 2025
Close: Jan 8, 2026
Renovation of the Administration Building - Phase II. General Construction; HVAC Construction; Electrical Construction.
AvailableQualified General Contractor to Construct the General Government Office Building - Phase I (Project). The General Government Office Building Phase I is a three (3) story 125,000 square foot (SF) office building.
Posted Date
Aug 22, 2025
Due Date
Jan 13, 2026
Release: Aug 22, 2025
Close: Jan 13, 2026
Qualified General Contractor to Construct the General Government Office Building - Phase I (Project). The General Government Office Building Phase I is a three (3) story 125,000 square foot (SF) office building.
AvailableWork include HVAC upgrades.
Posted Date
Sep 28, 2025
Due Date
Dec 24, 2025
Release: Sep 28, 2025
Close: Dec 24, 2025
Work include HVAC upgrades.
AvailableProject consists of construction of a new duct bank for the purpose of relocating the existing utilities. The base bid is for all work related to construction of the project including all mobilization, demolition, earthwork, erosion control, excavation, backfill, roadway construction, drainage systems, water and sewer systems, curb, gutter, sidewalks, retaining walls, protection of existing utility systems, miscellaneous clearing and grubbing, stone installations, including clean up and all incidentals necessary for construction. See attached file.
Posted Date
Aug 12, 2025
Due Date
Dec 22, 2025
Release: Aug 12, 2025
Close: Dec 22, 2025
Project consists of construction of a new duct bank for the purpose of relocating the existing utilities. The base bid is for all work related to construction of the project including all mobilization, demolition, earthwork, erosion control, excavation, backfill, roadway construction, drainage systems, water and sewer systems, curb, gutter, sidewalks, retaining walls, protection of existing utility systems, miscellaneous clearing and grubbing, stone installations, including clean up and all incidentals necessary for construction. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis