Work includes new replacement panel for the South Slope Lift Station. This includes a new 400 amp disconnect, new metering equipment, building a structure and mounting equipment.
Rehabilitation of an existing pump station. The pump station is a duplex submersible pump station. The rehabilitation scope includes removing the existing pumps and replacing them with new pumps and associated piping, fittings, valves. The scope of the rehabilitation includes pigging the existing force main, constructing a new discharge valve vault, installation of auxiliary equipment such as a permanent bypass pump and electrical and SCADA work associated with such.
Rehabilitation of an existing pump station. The pump station is a duplex submersible pump station. The rehabilitation scope includes removing the existing pumps and replacing them with new pumps and associated piping, fittings, valves. The scope of the rehabilitation includes pigging the existing force main, constructing a new discharge valve vault, installation of auxiliary equipment such as a permanent bypass pump and electrical and SCADA work associated with such.
The City of Plantation is soliciting bids for the rehabilitation of Lift Station No. 73. The work includes demolishing the existing drywell and equipment, converting the wet well to a manhole, and installing new pumps, piping, valves, and electrical equipment, along with related tree removal and demolition. The solicitation opened July 20, 2026, requires a mandatory pre-bid meeting and site visit on August 12, 2026, and closes August 25, 2026.
The City of Plantation is soliciting bids for the rehabilitation of Lift Station No. 73. The work includes demolishing the existing drywell and equipment, converting the wet well to a manhole, and installing new pumps, piping, valves, and electrical equipment, along with related tree removal and demolition. The solicitation opened July 20, 2026, requires a mandatory pre-bid meeting and site visit on August 12, 2026, and closes August 25, 2026.
Work consist of construction of site-built cast-in-place lift station concrete structure and associated masonry, site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent, installation of mechanical piping, valving, force mains, to and from the lift station, installation of mechanical piping, valving, force mains internal to the lift station, installation of fusion welding (HDPE), electrical work and connections to the lift station, and all internal electrical components of the lift station, installation and integration of communications, electrical controls, SCADA devices internal to the lift station, and external from the lift station. See attached file.
The City of Aurora is seeking to pre-qualify prime contractors to provide on-call services for the I-70 Lift Station Electrical Improvements project. The solicitation is identified as SOQ-26-5161A and is a construction opportunity involving electrical and related infrastructure work. Bids are due August 11, 2026, at 4:00 PM MDT, and the posting is a procurement solicitation rather than a grant program.
The City of Aurora is seeking to pre-qualify prime contractors to provide on-call services for the I-70 Lift Station Electrical Improvements project. The solicitation is identified as SOQ-26-5161A and is a construction opportunity involving electrical and related infrastructure work. Bids are due August 11, 2026, at 4:00 PM MDT, and the posting is a procurement solicitation rather than a grant program.
Win Opportunities Before the RFP
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
Work consist of construction of site-built cast-in-place lift station concrete structure and associated masonry, site excavation, dewatering, shoring, forming, grubbing, grading, paving, and restoration pertinent, installation of mechanical piping, valving, force mains, to and from the lift station, installation of mechanical piping, valving, force mains internal to the lift station, installation of fusion welding (HDPE), electrical work and connections to the lift station, and all internal electrical components of the lift station, installation and integration of communications, electrical controls, SCADA devices internal to the lift station, and external from the lift station. See attached file.