Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of new lpfm mains, new lpfm service connections and all associated fittings and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide landscape improvements services.
Posted Date
Oct 30, 2025
Due Date
Dec 18, 2025
Release: Oct 30, 2025
Close: Dec 18, 2025
Provide landscape improvements services.
AvailablePremium
Access the largest public sector contact database
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Work includes roadway improvements, stormwater improvements that include two separate exfiltration systems, existing sheet pile weir in the stormwater treatment area no. 1 and includes adding a baffle box at outfall no. 1, portable generator to be located to service the existing and future back-up pump systems.
AvailableThe project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
Posted Date
Nov 19, 2025
Due Date
Jan 14, 2026
Release: Nov 19, 2025
Close: Jan 14, 2026
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
AvailableWork includes to furnish and install approx. 1,400 LF of 6" force main including connections to existing lift station and existing manhole.
Posted Date
Dec 3, 2025
Due Date
Dec 16, 2025
Release: Dec 3, 2025
Close: Dec 16, 2025
Work includes to furnish and install approx. 1,400 LF of 6" force main including connections to existing lift station and existing manhole.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis