Retrieving RFP details
Release
Close
City of Hartford
South meadows dike toe drain, toe ditch, and embankment repairs.
Suny Upstate Medical University
Drain repairs in the basement at Onondaga nation health clinic.
U.S. Army Engineer District Portland
Miller-rice pile dike rehab. The Miller-Rice pile dike system as originally designed and constructed performed its intended function to divert the thalweg from the north side to the south side and maintain it there. The creation of dredge material placement islands and shoals and changes in system and morphology have altered the hydraulic function.
Matanuska-Susitna Borough
Work includes placement of riprap below the water surface in a dynamic river environment where water levels may fluctuate. The extent of in-water placement will depend on the river channel location and water levels at the time of construction. The project is scheduled for winter construction, when water levels are typically at their lowest.
Release
Oct 14, 2025
Close
Nov 06, 2025