Retrieving RFP details
Release
Close
City of Rogers
Project consist of approx 110,600 SY Mill Bituminous Surface; 5 EA of Remove and Replace Catch Basin; 8,700 SF Remove and Replace Concrete Sidewalk; 4,650 LF Remove and Replace Concrete Curb and Gutter; 660 TON Type SP 9.5 Wearing Course Mix 8' Path (2,B); 9,900 TON Type SP 9.5 Wearing Course Mix (3,C); 4 SYSTEM Revise Signal System
City of Rollingwood
Construction of mill and overlay services. approx. 4,329 SY 1.5" Mill and Overlay; 4,117 SY 2" Mill and Overlay; 3,759 SY 1.5” Mill and Overlay; Provide 24" TY- I White Stop Bar Thermoplastic Pavement Marking approximately 10-feet long, 90 MILS in thickness; Provide and Install TY- II-B-B Blue Reflective Raised Pavement Markers in the middle of the pavement; Excavate soft spots at directed and provide and place/compact HMAC Type "D" spot level up prior to HMAC overlay;
Ramsey County
Mill and overlay of the parking lots.
City of Alpharetta
Design-Build teams for Request for Proposals 26-107 for Alpha Loop Trail Design-Build from Haynes Bridge Rd to Encore Pkwy. This project is for the design and construction of a 12-foot wide lighted shared-use path connecting Haynes Bridge Road to Encore Parkway, approx. 1.2 miles.
Release
Oct 23, 2025
Close
Nov 14, 2025