Project consists of but not limited to 5,910 SY remove concrete pavement; 3,915 CY excavation; 5,510 tn aggregate base course; 1,675 ton HMA pavement 2,585 LF concrete curb & gutter; 1,420 LF dip water main; 1,225 LF 10" pvc sanitary sewer; 760 LF rcp storm sewer; 1,550 SY turf restoration; 1,750 LF pavement marking. 1 LS traffic control; 1 LS mobilization; 2,585 LF remove concrete curb and gutter; 1,025 SY remove asphaltic pavement (including driveways); 5,980 sy removing concrete pavement; 1,480 SY removing concrete sidewalk; 661 lf remove storm sewer pipe (under 24" diameter); 4 EA remove storm sewer manhole; 6 EA remove catch basin; 2 EA salvage hydrants; 33 EA remove curb stop; 8 EA remove water valve; 1,180 LF remove watermain; 235 LF abandon watermain. See attached file.