Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 16 HR potholing; 10 LF 4" C900 water pipe; 900 LF 12" C900 DR-11 water main by trenched; 1 LS D110 Type III water tank; 1 LS booster station pipe replacement. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The removal of two water storage tanks (60,000 and 30,000 gallons) and installation of one 135,000-gallon water storage tank.
Posted Date
Jan 16, 2026
Due Date
Feb 2, 2026
Release: Jan 16, 2026
Close: Feb 2, 2026
The removal of two water storage tanks (60,000 and 30,000 gallons) and installation of one 135,000-gallon water storage tank.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract 1, Elevated Water Storage Tank involves replacing the existing water storage tank, with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
Posted Date
Jan 15, 2026
Due Date
Feb 12, 2026
Release: Jan 15, 2026
Close: Feb 12, 2026
Contract 1, Elevated Water Storage Tank involves replacing the existing water storage tank, with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
AvailableWork include well water tank replacement.
Posted Date
Nov 3, 2025
Due Date
Jan 22, 2026
Release: Nov 3, 2025
Close: Jan 22, 2026
Work include well water tank replacement.
Install a new 30,000 gal concrete water tank, control system, 2" through 4" water main and valves, and site restoration. There is an Alternate bid item to remove an existing concrete water tank.
Posted Date
Jan 13, 2026
Due Date
Feb 10, 2026
Release: Jan 13, 2026
Close: Feb 10, 2026
Install a new 30,000 gal concrete water tank, control system, 2" through 4" water main and valves, and site restoration. There is an Alternate bid item to remove an existing concrete water tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →