Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction contract to demolish (or replace) and build two ADA‑compliant dune crossovers at South 7th Street (~237 ft) and Flagler Lane (~222 ft), supplying all labor, materials, equipment; structures specified as pressure‑treated Southern Yellow Pine with 6" diameter wood piles (10' embedment), 316 stainless‑steel hardware and stainless handrails, ADA ramps/landings, and required shop drawings — proposals must include lump‑sum and schedule of unit prices.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
The City of Cocoa Beach is soliciting proposals to replace existing ADA dune crossovers at South 7th Street and Flagler Lane, including demolition and construction of new ADA-compliant timber crossovers with landings, ramps, handrails, and structural supports. The project spans approximately 237 ft at South 7th Street and 222 ft at Flagler Lane and specifies Southern Yellow Pine pressure-treated timber per project drawings and applicable codes. Documents (plans, RFP/specifications, legal ad) are distributed via DemandStar and a non-mandatory pre-bid conference is scheduled for December 12, 2025.
Posted Date
Nov 23, 2025
Due Date
Jan 2, 2026
Release: Nov 23, 2025
Close: Jan 2, 2026
The City of Cocoa Beach is soliciting proposals to replace existing ADA dune crossovers at South 7th Street and Flagler Lane, including demolition and construction of new ADA-compliant timber crossovers with landings, ramps, handrails, and structural supports. The project spans approximately 237 ft at South 7th Street and 222 ft at Flagler Lane and specifies Southern Yellow Pine pressure-treated timber per project drawings and applicable codes. Documents (plans, RFP/specifications, legal ad) are distributed via DemandStar and a non-mandatory pre-bid conference is scheduled for December 12, 2025.
AvailableWork includes temporary traffic control, demolition, hauling and disposal, clearing & grubbing, excavation, grading and compaction, concrete sidewalk, concrete ada parking space with van access aisle, timber railing along sidewalk, timber pedestrian access structure with aluminum handrail, pavement striping, ada signage and wheel stop, and bahia sod.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
Work includes temporary traffic control, demolition, hauling and disposal, clearing & grubbing, excavation, grading and compaction, concrete sidewalk, concrete ada parking space with van access aisle, timber railing along sidewalk, timber pedestrian access structure with aluminum handrail, pavement striping, ada signage and wheel stop, and bahia sod.
AvailableThe Illinois Department of Transportation is soliciting bids for 5.3 miles of resurfacing on IL 111 from south of Sherman Street in Palmyra to south of Cheshire Lane north of Hettick in Macoupin County. The project is part of the January 16, 2026 IDOT letting. Bids are due at 12:00 PM on the letting date via IDOT’s WCTB/iCX system.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation is soliciting bids for 5.3 miles of resurfacing on IL 111 from south of Sherman Street in Palmyra to south of Cheshire Lane north of Hettick in Macoupin County. The project is part of the January 16, 2026 IDOT letting. Bids are due at 12:00 PM on the letting date via IDOT’s WCTB/iCX system.
AvailableConstructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
Posted Date
Dec 4, 2025
Due Date
Dec 19, 2025
Release: Dec 4, 2025
Close: Dec 19, 2025
Constructions of the 7th and State St Crosswalk Improvements. Specific work includes to, right of way work, sidewalk restoration, electrical work, and a new RRFB system at the crosswalk of 7th and State St.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis