Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the fire island inlet. The scope of design work includes the design for the new foundation system and connections. The scope of construction work includes, but may not be limited to, disconnect utilities, excavation around building footprint, evenly jack up the structure with appropriate cribbing/supports, install new foundation elements, install new foundation elements and floor where slab separation was required, lower house and secure to new foundation, and reconnect utilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Army Corps of Engineers (USACE) is issuing a Sources Sought for a nonstructural home elevation project to elevate approximately 10–15 homes to mitigate flood risk along the Fire Island Inlet to Montauk Point (FIMP) 7a area in Suffolk County, NY. The scope includes screening, design, construction and post-construction activities, including disconnecting utilities, excavating around building footprints, structure jacking, installing new foundation elements, and reconnecting utilities; the contractor must comply with local, state, and federal requirements and provide a site-specific safety plan and schedule. The opportunity is listed as a sole-source/sources-sought action under NAICS 236118 and is an IDIQ single-award task order type; estimated budget range is indicated on the aggregator as roughly $5M–$20M (informational).
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
The U.S. Army Corps of Engineers (USACE) is issuing a Sources Sought for a nonstructural home elevation project to elevate approximately 10–15 homes to mitigate flood risk along the Fire Island Inlet to Montauk Point (FIMP) 7a area in Suffolk County, NY. The scope includes screening, design, construction and post-construction activities, including disconnecting utilities, excavating around building footprints, structure jacking, installing new foundation elements, and reconnecting utilities; the contractor must comply with local, state, and federal requirements and provide a site-specific safety plan and schedule. The opportunity is listed as a sole-source/sources-sought action under NAICS 236118 and is an IDIQ single-award task order type; estimated budget range is indicated on the aggregator as roughly $5M–$20M (informational).
AvailableThe scope of this work includes, but may not be limited to, initial screening to determine the suitability of structures to be raised, design, construction, and post construction activities. The scope of preliminary engineering/architectural investigations includes documentation of existing conditions assessments, including the development of measured floor plans showing load bearing walls and foundation element details, pertinent structure elevations, such as, the existing first floor elevation; existing grade; the elevation of the basement (if applicable); boundary/property line surveys; electrical and mechanical equipment such as hvac and boiler units; and utility connections.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
The scope of this work includes, but may not be limited to, initial screening to determine the suitability of structures to be raised, design, construction, and post construction activities. The scope of preliminary engineering/architectural investigations includes documentation of existing conditions assessments, including the development of measured floor plans showing load bearing walls and foundation element details, pertinent structure elevations, such as, the existing first floor elevation; existing grade; the elevation of the basement (if applicable); boundary/property line surveys; electrical and mechanical equipment such as hvac and boiler units; and utility connections.
Non-structural construction.
Posted Date
Nov 13, 2025
Due Date
Jan 9, 2026
Release: Nov 13, 2025
Close: Jan 9, 2026
Non-structural construction.
AvailableThe Mission and Installation Contracting Command (MICC) at Fort Buchanan, Puerto Rico is conducting market research to identify 8(a) small businesses capable of providing grounds/ground maintenance services at Fort Buchanan installations. This Sources Sought is informational only (not a solicitation) and requests capabilities statements, CAGE/UEI, socio-economic status, and tailored capability statements; a draft Performance Work Statement (PWS) is referenced. Responses are voluntary and must be emailed to the contracting points of contact.
Posted Date
Dec 10, 2025
Due Date
Dec 22, 2025
Release: Dec 10, 2025
Close: Dec 22, 2025
The Mission and Installation Contracting Command (MICC) at Fort Buchanan, Puerto Rico is conducting market research to identify 8(a) small businesses capable of providing grounds/ground maintenance services at Fort Buchanan installations. This Sources Sought is informational only (not a solicitation) and requests capabilities statements, CAGE/UEI, socio-economic status, and tailored capability statements; a draft Performance Work Statement (PWS) is referenced. Responses are voluntary and must be emailed to the contracting points of contact.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis