Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Non-structural construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The scope of work includes, but may not be limited to, design, homeowner meetings, and construction (disconnect utilities, excavation around building footprint, evenly jack up the structure with appropriate cribbing/supports, install new foundation elements, and install new floor where applicable (e.g. slab separation), lower house and secure to new foundation, and reconnect utilities), and post-construction activities. Floodproofing actions may be associated with the elevation such as filling of basement, protection of utilities, and raising AC and/or louvers as appropriate for each home.
Posted Date
Dec 1, 2025
Due Date
Dec 19, 2025
Premium
Access the largest public sector contact database
Close: Dec 19, 2025
The scope of work includes, but may not be limited to, design, homeowner meetings, and construction (disconnect utilities, excavation around building footprint, evenly jack up the structure with appropriate cribbing/supports, install new foundation elements, and install new floor where applicable (e.g. slab separation), lower house and secure to new foundation, and reconnect utilities), and post-construction activities. Floodproofing actions may be associated with the elevation such as filling of basement, protection of utilities, and raising AC and/or louvers as appropriate for each home.
AvailableThe U.S. Army Corps of Engineers (USACE) is issuing a Sources Sought for a nonstructural home elevation project to elevate approximately 10–15 homes to mitigate flood risk along the Fire Island Inlet to Montauk Point (FIMP) 7a area in Suffolk County, NY. The scope includes screening, design, construction and post-construction activities, including disconnecting utilities, excavating around building footprints, structure jacking, installing new foundation elements, and reconnecting utilities; the contractor must comply with local, state, and federal requirements and provide a site-specific safety plan and schedule. The opportunity is listed as a sole-source/sources-sought action under NAICS 236118 and is an IDIQ single-award task order type; estimated budget range is indicated on the aggregator as roughly $5M–$20M (informational).
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
The U.S. Army Corps of Engineers (USACE) is issuing a Sources Sought for a nonstructural home elevation project to elevate approximately 10–15 homes to mitigate flood risk along the Fire Island Inlet to Montauk Point (FIMP) 7a area in Suffolk County, NY. The scope includes screening, design, construction and post-construction activities, including disconnecting utilities, excavating around building footprints, structure jacking, installing new foundation elements, and reconnecting utilities; the contractor must comply with local, state, and federal requirements and provide a site-specific safety plan and schedule. The opportunity is listed as a sole-source/sources-sought action under NAICS 236118 and is an IDIQ single-award task order type; estimated budget range is indicated on the aggregator as roughly $5M–$20M (informational).
AvailableThe scope of this work includes, but may not be limited to, initial screening to determine the suitability of structures to be raised, design, construction, and post construction activities. The scope of preliminary engineering/architectural investigations includes documentation of existing conditions assessments, including the development of measured floor plans showing load bearing walls and foundation element details, pertinent structure elevations, such as, the existing first floor elevation; existing grade; the elevation of the basement (if applicable); boundary/property line surveys; electrical and mechanical equipment such as hvac and boiler units; and utility connections.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
Close: Dec 16, 2025
The scope of this work includes, but may not be limited to, initial screening to determine the suitability of structures to be raised, design, construction, and post construction activities. The scope of preliminary engineering/architectural investigations includes documentation of existing conditions assessments, including the development of measured floor plans showing load bearing walls and foundation element details, pertinent structure elevations, such as, the existing first floor elevation; existing grade; the elevation of the basement (if applicable); boundary/property line surveys; electrical and mechanical equipment such as hvac and boiler units; and utility connections.
AvailableRelease: Dec 11, 2025
Close: Dec 22, 2025
Converter, inlet, NSN 4820014587035, Qty 15.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis