Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of waterline placement by open cut and directional drill, base course, milling and overlay of existing asphalt roadway, portland cement concrete sidewalk and driveways.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Jefferson Parish Purchasing Department issued a solicitation to improve water infrastructure along Sonia Place between S. Labarre Road and Santa Ana Avenue, including waterline installation, asphalt milling, overlay, and concrete sidewalk and driveway construction. The contract must be awarded and work completed by January 27, 2026, and requires performance and payment bonds. No primary PDF document is linked; the original posting is on the Louisiana PAC open opportunities search page.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Jefferson Parish Purchasing Department issued a solicitation to improve water infrastructure along Sonia Place between S. Labarre Road and Santa Ana Avenue, including waterline installation, asphalt milling, overlay, and concrete sidewalk and driveway construction. The contract must be awarded and work completed by January 27, 2026, and requires performance and payment bonds. No primary PDF document is linked; the original posting is on the Louisiana PAC open opportunities search page.
The project consists of waterline placement by open cut and directional drill, base course, milling and overlay of existing asphalt roadway, portland cement concrete sidewalk and driveways.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
The project consists of waterline placement by open cut and directional drill, base course, milling and overlay of existing asphalt roadway, portland cement concrete sidewalk and driveways.
AvailableInstallation of 2,256 LF of 12, 8, and 10" PVC potable waterline, including all fittings, valves, and connections, excavation, shoring, bedding and backfill; surface restoration, including pavement and sidewalks; reconnection of existing water services; temporary erosion and sediment controls; all labor, equipment, materials, and incidentals necessary to complete the work.
Posted Date
Dec 11, 2025
Due Date
Jan 21, 2026
Release: Dec 11, 2025
Close: Jan 21, 2026
Installation of 2,256 LF of 12, 8, and 10" PVC potable waterline, including all fittings, valves, and connections, excavation, shoring, bedding and backfill; surface restoration, including pavement and sidewalks; reconnection of existing water services; temporary erosion and sediment controls; all labor, equipment, materials, and incidentals necessary to complete the work.
AvailableInstallation of 2,256 LF of 12, 8, and 10" PVC potable waterline, including all fittings, valves, and connections, excavation, shoring, bedding and backfill; surface restoration, including pavement and sidewalks; reconnection of existing water services; temporary erosion and sediment controls; all labor, equipment, materials, and incidentals necessary to complete the work.
Posted Date
Dec 11, 2025
Due Date
Jan 21, 2026
Release: Dec 11, 2025
Close: Jan 21, 2026
Installation of 2,256 LF of 12, 8, and 10" PVC potable waterline, including all fittings, valves, and connections, excavation, shoring, bedding and backfill; surface restoration, including pavement and sidewalks; reconnection of existing water services; temporary erosion and sediment controls; all labor, equipment, materials, and incidentals necessary to complete the work.