Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
North Collin County Municipal Utility District No. 1 is soliciting bids for construction of water, sanitary sewer, and storm sewer improvements serving the Songhill Phase 2 development in Collin County, Texas. Bid opening is scheduled for February 19, 2026 at 2:00 PM CST at BGE, Inc.'s Frisco office, with bid documents and plans posted to CivCast. The scope includes utility infrastructure for the subdivision; this is not a grant program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The North Collin County Municipal Utility District No. 1 is soliciting construction bids for paving and sidewalk improvements for the Songhill Phase 2 development in Collin County, Texas. The scope includes reinforced concrete pavement, lime-stabilized subgrade, sidewalks, barrier-free ramps, and residential street signs with an estimated project value of $2.5M to $3.5M. Bids are due by February 19, 2026, and must include required performance, payment, and maintenance bonds.
Posted Date
Jan 30, 2026
Due Date
Feb 19, 2026
Release: Jan 30, 2026
Close: Feb 19, 2026
The North Collin County Municipal Utility District No. 1 is soliciting construction bids for paving and sidewalk improvements for the Songhill Phase 2 development in Collin County, Texas. The scope includes reinforced concrete pavement, lime-stabilized subgrade, sidewalks, barrier-free ramps, and residential street signs with an estimated project value of $2.5M to $3.5M. Bids are due by February 19, 2026, and must include required performance, payment, and maintenance bonds.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 17, 2026
Work includes utility improvements.
AvailableWork includes water treatment facility improvements (phase 2).
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Work includes water treatment facility improvements (phase 2).
AvailableThe City of Sacramento is soliciting qualifications from a qualified engineering consultant team to provide preliminary engineering, public and stakeholder outreach, utility coordination, right-of-way services, environmental clearance, final design, preparation of plans/specifications/estimates, bidding assistance, and design services during construction for the Dixieanne Alleyways Improvements Project – Phase 2. The work focuses on improving public alleyways in the Dixieanne neighborhood of Old North Sacramento and implementing low-stress pedestrian and bicycle routes. This is an RFP for professional services (not a grant) with an estimated value range noted on the posting.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
The City of Sacramento is soliciting qualifications from a qualified engineering consultant team to provide preliminary engineering, public and stakeholder outreach, utility coordination, right-of-way services, environmental clearance, final design, preparation of plans/specifications/estimates, bidding assistance, and design services during construction for the Dixieanne Alleyways Improvements Project – Phase 2. The work focuses on improving public alleyways in the Dixieanne neighborhood of Old North Sacramento and implementing low-stress pedestrian and bicycle routes. This is an RFP for professional services (not a grant) with an estimated value range noted on the posting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →