Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Mid-Coastside Sewer Authority
Sewer Authority Mid-Coastside seeks proposals for a Power Purchase Agreement for solar photovoltaic and/or solar + battery energy storage systems at its wastewater treatment facility in Half Moon Bay, CA. The project involves engineering, procurement, construction, and maintenance of the systems, with a focus on maximizing energy cost savings. Proposers must have experience with commercial solar installations and battery storage, particularly in California municipalities.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
University Of California Merced
Seeking a qualified solar energy photovoltaic (pv) system and battery energy storage system (bess) provider that shall finance, design, install, own, operate and maintain a solar pv and bess system on uc mercedowned property and sell electrical output to uc merced on a fixed cost per kwh.
Posted Date
Sep 25, 2025
Due Date
Dec 1, 2025
Release: Sep 25, 2025
University Of California Merced
Close: Dec 1, 2025
Seeking a qualified solar energy photovoltaic (pv) system and battery energy storage system (bess) provider that shall finance, design, install, own, operate and maintain a solar pv and bess system on uc mercedowned property and sell electrical output to uc merced on a fixed cost per kwh.
AvailableAlabama A M University
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
Posted Date
Oct 16, 2025
Due Date
Dec 1, 2025
Release: Oct 16, 2025
Alabama A M University
Close: Dec 1, 2025
Qualified contractors for the design, installation, and operation of a turnkey Photovoltaic (PV) solar power system integrated with a Battery Energy Storage System (BESS).
AvailableTulalip Tribes of Washington
Design for solar and battery storage & microgrid integration. Design a solar PV and battery storage system for the Betty Taylor Learning Academy and integrate this system with the Gathering Hall microgrid. The basis of this design solicitation seeks support for: Solar PV: Final design support for a 240kW-DC rooftop solar array, mounted on existing standing seam metal roof, southeast facing. Battery Energy Storage System: Coupled storage capacity with a minimum of 500kW-1320kWh storage potential that is integrated with the Tulalip Gathering Hall microgrid project, which will be completed in the fall of 2026. 1500kW Diesel Generator: Resilience support through planned interconnection with an existing 1500kW diesel generator to support the building in prolonged outages.
Posted Date
Oct 20, 2025
Due Date
Nov 20, 2025
Release: Oct 20, 2025
Tulalip Tribes of Washington
Close: Nov 20, 2025
Design for solar and battery storage & microgrid integration. Design a solar PV and battery storage system for the Betty Taylor Learning Academy and integrate this system with the Gathering Hall microgrid. The basis of this design solicitation seeks support for: Solar PV: Final design support for a 240kW-DC rooftop solar array, mounted on existing standing seam metal roof, southeast facing. Battery Energy Storage System: Coupled storage capacity with a minimum of 500kW-1320kWh storage potential that is integrated with the Tulalip Gathering Hall microgrid project, which will be completed in the fall of 2026. 1500kW Diesel Generator: Resilience support through planned interconnection with an existing 1500kW diesel generator to support the building in prolonged outages.
City of Boulder City
The City of Boulder City, Nevada seeks proposals for the development of utility-scale solar power generation and/or battery energy storage system facilities. The project involves leasing city property for the construction and operation of these facilities, with a focus on renewable energy development. Proposers must plan, finance, develop, construct, and operate the facilities, adhering to specific lease rates and fire safety assessment fees. The RFP emphasizes compliance with Nevada laws and Boulder City ordinances.
Posted Date
Nov 13, 2025
Due Date
Feb 11, 2026
Release: Nov 13, 2025
City of Boulder City
Close: Feb 11, 2026
The City of Boulder City, Nevada seeks proposals for the development of utility-scale solar power generation and/or battery energy storage system facilities. The project involves leasing city property for the construction and operation of these facilities, with a focus on renewable energy development. Proposers must plan, finance, develop, construct, and operate the facilities, adhering to specific lease rates and fire safety assessment fees. The RFP emphasizes compliance with Nevada laws and Boulder City ordinances.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis