Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requesting bids from Stage II Prequalified Mechanical Contractors for construction services to install a new Saw Dust Collection System including collector and associated ductwork.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for the replacement of existing AH/CU at Snow College Humanities.
Posted Date
Jan 5, 2026
Due Date
Jan 29, 2026
Release: Jan 5, 2026
Close: Jan 29, 2026
Procurement of construction services for the replacement of existing AH/CU at Snow College Humanities.
AvailableThe El Camino Community College District issued ITB #2026-2 for replacement of the dust collection system at its Construction Technology Facility, including installation of a WOOD 121FT10 baghouse dust collector, three explosion‑protected housings, a discharge hopper, ladder and service platform, rotary air lock, electrical control panel with soft start, and a 14,000 CFM ground‑mount exhaust fan. Prevailing wages apply and bids must be submitted electronically via PlanetBids after registering; a mandatory pre‑bid/job walk is scheduled for Jan 8, 2026 at 10:00 AM (PST). Bids are due Jan 26, 2026 at 12:00 PM (PST).
Posted Date
Dec 17, 2025
Due Date
Jan 26, 2026
Release: Dec 17, 2025
Close: Jan 26, 2026
The El Camino Community College District issued ITB #2026-2 for replacement of the dust collection system at its Construction Technology Facility, including installation of a WOOD 121FT10 baghouse dust collector, three explosion‑protected housings, a discharge hopper, ladder and service platform, rotary air lock, electrical control panel with soft start, and a 14,000 CFM ground‑mount exhaust fan. Prevailing wages apply and bids must be submitted electronically via PlanetBids after registering; a mandatory pre‑bid/job walk is scheduled for Jan 8, 2026 at 10:00 AM (PST). Bids are due Jan 26, 2026 at 12:00 PM (PST).
AvailableThe vendor prepared a design and cost proposal to replace the unit with a Donaldson Torit 121FT10 Baghouse Dust Collector, providing approx 10,600 CFM of airflow. The new system includes NFPA 69 and EN 16447-compliant explosion-isolation components (VigiFlap valves, explosion vents, and sensors), upgraded ducting, a reinforced concrete pad, and a custom control panel.
Posted Date
Oct 21, 2025
Due Date
Jan 26, 2026
Release: Oct 21, 2025
Close: Jan 26, 2026
The vendor prepared a design and cost proposal to replace the unit with a Donaldson Torit 121FT10 Baghouse Dust Collector, providing approx 10,600 CFM of airflow. The new system includes NFPA 69 and EN 16447-compliant explosion-isolation components (VigiFlap valves, explosion vents, and sensors), upgraded ducting, a reinforced concrete pad, and a custom control panel.
AvailableSeeking for polyaluminum chloride(pac).
Posted Date
Dec 16, 2025
Due Date
Jan 26, 2026
Release: Dec 16, 2025
Close: Jan 26, 2026
Seeking for polyaluminum chloride(pac).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →