California Department of Corrections and Rehabilitation
State AgencyCA
Posted
Sep 14, 2026
Dec 2, 2026
Complete Roofing System RFP
Roof replacements (fy 18/19 bcp). Roofing membrane, membrane flashings, detail Membrane white strip, cover strip, rigid roofing insulation, tapered insulation, crickets, vapor barrier retarder, 1/2" protection roof boards (primed and un- primed), foil face tapes, wall and base roof vents, termination tapes, fasteners, anchors, termination bars, protection walk pads, pipe flashings, pre-primed barrier boards, stainless steel pipe clamps, pre-formed crickets and cant, scuppers and retro-fit roof drain insert extensions.
