Ohio Department of Transportation
State AgencyOH
Posted
Nov 5, 2026
Dec 17, 2026
SLIDE REPAIR C/R/S: BEL-SR 149-08.55 (PART 1 AND PART 2) RFP
The project involves installing steel soldier-pile and concrete drilled-shaft retaining walls with prestressed concrete lagging at three locations. It also includes full-depth asphalt-concrete replacement and guardrail upgrades. Drainage improvements are included as well.
