Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 1,012 LS 18" ductile iron pipe; 109 LF of 18" CIPP lining; 1 LS bypass pumping. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Improvements consist of approx. 16,300 LF of 48" and 42" diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Bid items: 1 LS erosion control plans; 100 SY of 5" sidewalk; 90 LF of 24" solid thermoplastic striping (W); 1 LS trench dewatering; 642 LF of 66" encastment pipe, ty steel, open-cut; 21 Ea of 7 LF polymer conc manhole, complete in place;
Posted Date
-
Due Date
Dec 19, 2025
Close:
Premium
Access the largest public sector contact database
Improvements consist of approx. 16,300 LF of 48" and 42" diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Bid items: 1 LS erosion control plans; 100 SY of 5" sidewalk; 90 LF of 24" solid thermoplastic striping (W); 1 LS trench dewatering; 642 LF of 66" encastment pipe, ty steel, open-cut; 21 Ea of 7 LF polymer conc manhole, complete in place;
AvailableImprovements consist of approx. 16,300 LF of 48" and 42" diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Bid items: 1 LS erosion control plans; 100 SY of 5" sidewalk; 90 LF of 24" solid thermoplastic striping (W); 1 LS trench dewatering; 642 LF of 66" encastment pipe, ty steel, open-cut; 21 Ea of 7 LF polymer conc manhole, complete in place;
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Improvements consist of approx. 16,300 LF of 48" and 42" diameter wastewater interceptor from Enclave at Brushy Creek Lift Station to the upstream end of the Brushy Creek Interceptor Phase 3 project. The project also includes the decommissioning of the Enclave at Brushy Creek Lift Station. The purpose of the project is to facilitate continued, rapid growth in the City of Hutto which is necessitating the decommissioning of the Enclave at Brushy Creek Lift Station which has reached capacity and is not feasible to expand. Bid items: 1 LS erosion control plans; 100 SY of 5" sidewalk; 90 LF of 24" solid thermoplastic striping (W); 1 LS trench dewatering; 642 LF of 66" encastment pipe, ty steel, open-cut; 21 Ea of 7 LF polymer conc manhole, complete in place;
AvailableThe City of Lee’s Summit requests Statements of Qualifications from firms to provide professional services for the Cedar Creek Interceptor Phase IV project. Submittals must be submitted electronically via Public Purchase by December 12, 2025 at 4:00 PM local time.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
The City of Lee’s Summit requests Statements of Qualifications from firms to provide professional services for the Cedar Creek Interceptor Phase IV project. Submittals must be submitted electronically via Public Purchase by December 12, 2025 at 4:00 PM local time.
Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approx 4,200 LF of 36" wastewater interceptor, 4,100 FT of 30" wastewater interceptor, and 3,625 feet of 24" wastewater interceptor.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approx 4,200 LF of 36" wastewater interceptor, 4,100 FT of 30" wastewater interceptor, and 3,625 feet of 24" wastewater interceptor.