Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of existing concrete sidewalks, including the removal of tree roots, as needed, and all necessary restoration of the areas.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 7 EA temporary drainage inlet protection; 14,421 SF remove sidewalk; 554 LF remove curb; 205 LF remove curb and gutter; 3,704 SF remove driveway; 2,954 SF remove asphalt; 314 CY excavation; 16,496 SF 4 inch sidewalk and driveway; 607 LF concrete curb; 263 LF concrete curb and gutter; 495 SF 6 inch driveway and sidewalk; 90 SF 4" patterned / decorative / brick sidewalk & driveway; 13 EA curb ramp (ada compliant). See attached file.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes 7 EA temporary drainage inlet protection; 14,421 SF remove sidewalk; 554 LF remove curb; 205 LF remove curb and gutter; 3,704 SF remove driveway; 2,954 SF remove asphalt; 314 CY excavation; 16,496 SF 4 inch sidewalk and driveway; 607 LF concrete curb; 263 LF concrete curb and gutter; 495 SF 6 inch driveway and sidewalk; 90 SF 4" patterned / decorative / brick sidewalk & driveway; 13 EA curb ramp (ada compliant). See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide beveling services to remove sidewalk trip hazards. These services shall not include concrete grinding or pulverizing.
Posted Date
Dec 15, 2025
Due Date
Jan 9, 2026
Release: Dec 15, 2025
Close: Jan 9, 2026
Provide beveling services to remove sidewalk trip hazards. These services shall not include concrete grinding or pulverizing.
Repair and replacement of deficient sidewalk segments identified as high-priority.
Posted Date
Dec 15, 2025
Due Date
Jan 30, 2026
Release: Dec 15, 2025
Close: Jan 30, 2026
Repair and replacement of deficient sidewalk segments identified as high-priority.
AvailableRelease: Dec 12, 2025
Close: Jan 15, 2026
Work includes sidewalk repair.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →