Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk reconstruction. Remove 235'L x 4'W of sidewalk and replace with 235'L x 5'W of sidewalk. Remove landscape timber and replace with concrete wall. Milling/paving,
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 1, 2025
Close: Dec 24, 2025
Citywide brick sidewalk reconstruction.
AvailablePremium
Access the largest public sector contact database
Release: Dec 1, 2025
Close: Dec 24, 2025
Citywide concrete sidewalk reconstruction.
AvailableReconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
AvailableSpokane County is soliciting bids for sidewalk repair and replacement work along West Broadway Avenue, with construction scheduled for spring 2026. The county issued Invitation to Bid ITB #25-7022 and is seeking qualified contractors to provide labor, materials, equipment, permitting and coordination; bids are due Dec 22, 2025.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Spokane County is soliciting bids for sidewalk repair and replacement work along West Broadway Avenue, with construction scheduled for spring 2026. The county issued Invitation to Bid ITB #25-7022 and is seeking qualified contractors to provide labor, materials, equipment, permitting and coordination; bids are due Dec 22, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis