Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk construction, repair and replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Spokane County (WA) issued ITB #25-7022 for sidewalk repair and replacement along West Broadway Avenue, covering demolition, subsurface preparation, and installation of new concrete sidewalks with traffic control and prevailing wage requirements. The project is estimated at about $150,000 and requires compliance with applicable state and local public works regulations; a pre-bid meeting is scheduled. Bids opened on 2025-12-01 and are due on 2026-01-14 (deadline reported as 1:00 PM PST).
Posted Date
Dec 1, 2025
Due Date
Jan 14, 2026
Release: Dec 1, 2025
Close: Jan 14, 2026
Spokane County (WA) issued ITB #25-7022 for sidewalk repair and replacement along West Broadway Avenue, covering demolition, subsurface preparation, and installation of new concrete sidewalks with traffic control and prevailing wage requirements. The project is estimated at about $150,000 and requires compliance with applicable state and local public works regulations; a pre-bid meeting is scheduled. Bids opened on 2025-12-01 and are due on 2026-01-14 (deadline reported as 1:00 PM PST).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sidewalk Panel Replacement on the NE side of the Village.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Sidewalk Panel Replacement on the NE side of the Village.
AvailableFurnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Furnishing all the labor, materials, equipment, and doing all the work necessary for the construction and completion of approximately 35,600 LF curb & gutter replacement; 86,770 SF sidewalk, curb ramp and driveway approach replacement; 916 SF new sidewalk construction, 555 SY full depth concrete street pavement patching and grass terrace restoration.
AvailableRelease: Dec 22, 2025
Close: Jan 26, 2026
Sidewalk replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →