Summary
Installation, maintenance, and removal of all required erosion and sediment control measures. Clearing of all trees and vegetation within the designated project boundaries. Stockpiling of cleared trees and associated debris at an onsite location designated by the owner. Furnishing, hauling, transporting, and placing approx., 30,000 CY of select structural fill material (compacted in place; not loose volume) meeting all specified geotechnical and compaction requirements. Placement, machine compaction of structural fill in specified lift thicknesses to achieve the required proctor density. Grading and shaping of fill stockpile areas, including sloping of embankments and side slopes as required by the plans and specifications. Maintenance of haul routes and construction access necessary to perform the work. Final stabilization and seeding of structural fill stockpile areas and all disturbed areas as required.