Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide HVAC systems replacement. This project contains the demolition and removal of existing equipment as well as the installation of new equipment to replace removed items. The equipment being demolished and replaced includes but is not limited to three (3) rooftop units serving the main level, three (3) gas furnaces and their associated condensing units serving the lower level, replacing one (1) gas furnace and its associated condenser serving the second floor, and replacing one (1) roof mounted exhausted fan. Additional work includes but is not limited to cleaning all existing hard ductwork in the building (excluding apparatus bay), replacing all flex duct on the main level and second floor, and rebalancing all building systems. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
Posted Date
Dec 7, 2025
Due Date
Dec 29, 2025
Release: Dec 7, 2025
Close: Dec 29, 2025
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
AvailableFull HVAC replacement for a 74,078 GSF building, to include new mechanical rooms, mechanical shafts, roof top equipment, associated partial demolition of building components to accommodate the HVAC replacement, and associated structural and electrical work.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Full HVAC replacement for a 74,078 GSF building, to include new mechanical rooms, mechanical shafts, roof top equipment, associated partial demolition of building components to accommodate the HVAC replacement, and associated structural and electrical work.
AvailableThe construction management firm shall provide pre-construction, construction, close-out services, and other work for quonset public safety building.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
The construction management firm shall provide pre-construction, construction, close-out services, and other work for quonset public safety building.
AvailableWork includes HVAC removal/installation, electrical, and construction services.
Posted Date
Dec 11, 2025
Due Date
Dec 25, 2025
Release: Dec 11, 2025
Close: Dec 25, 2025
Work includes HVAC removal/installation, electrical, and construction services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis