Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of the elevated water tank.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation of the Butlertown water tank including repairs, painting preparation and internal and external wet and dry area painting.
Posted Date
Jan 29, 2026
Due Date
Feb 26, 2026
Release: Jan 29, 2026
Close: Feb 26, 2026
Rehabilitation of the Butlertown water tank including repairs, painting preparation and internal and external wet and dry area painting.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a rehabilitation an elevated water storage tank.
Posted Date
Jan 26, 2026
Due Date
Feb 25, 2026
Release: Jan 26, 2026
Close: Feb 25, 2026
Construction of a rehabilitation an elevated water storage tank.
AvailableWork includes interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a two-million-gallon reservoir with a 93-foot diameter and a sidewall height of 40 feet.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Work includes interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a two-million-gallon reservoir with a 93-foot diameter and a sidewall height of 40 feet.
AvailableWork consists of installing a cross connection between recycled and potable water lines. This work also consists of rehabilitation of a recycled water storage tank including installation of a new aluminum roof, a new cathodic protection unit, and a new ladder with landing platform, as well as coating of the interior, exterior, and appurtenances. Work also consists of 53 LF of trenching; 40 CY of compaction; 85 LF of 14" id dip; 185 sf of pipe coating; 7.5 CY of concrete slab and footing.
Posted Date
Dec 18, 2025
Due Date
Feb 5, 2026
Release: Dec 18, 2025
Close: Feb 5, 2026
Work consists of installing a cross connection between recycled and potable water lines. This work also consists of rehabilitation of a recycled water storage tank including installation of a new aluminum roof, a new cathodic protection unit, and a new ladder with landing platform, as well as coating of the interior, exterior, and appurtenances. Work also consists of 53 LF of trenching; 40 CY of compaction; 85 LF of 14" id dip; 185 sf of pipe coating; 7.5 CY of concrete slab and footing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →