Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for 134m of ditch cleanout and the supply and installation of two access culverts.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Temple is soliciting bids to remove the existing drainage system and reconstruct a new drainage system for Ferguson Park, with an engineer’s estimate of approximately $92,585 and a 60-calendar-day completion requirement from Notice to Proceed. The procurement is an Invitation to Bid (ITB) posted by the City of Temple, with virtual pre-bid and bid opening events and a questions deadline noted on the buyer portal. The solicitation is open (as of 2026-01-13) and submissions are due Feb 3, 2026 at 2:00 PM CST.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
The City of Temple is soliciting bids to remove the existing drainage system and reconstruct a new drainage system for Ferguson Park, with an engineer’s estimate of approximately $92,585 and a 60-calendar-day completion requirement from Notice to Proceed. The procurement is an Invitation to Bid (ITB) posted by the City of Temple, with virtual pre-bid and bid opening events and a questions deadline noted on the buyer portal. The solicitation is open (as of 2026-01-13) and submissions are due Feb 3, 2026 at 2:00 PM CST.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes improve drainage by resealing and repairing drain pipes, and catch basins.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work includes improve drainage by resealing and repairing drain pipes, and catch basins.
AvailablePropose a drainage system for a house with standing water that does not drain.
Posted Date
Jan 8, 2026
Due Date
Jan 21, 2026
Release: Jan 8, 2026
Close: Jan 21, 2026
Propose a drainage system for a house with standing water that does not drain.
AvailableWork consist of 2,500 SY of saw cut, removal and disposal of asphalt pavement up to 2" thick, 1,000 SY of additional cost per 1" thickness after 2" to saw cut, remove and dispose of asphalt pavement, 15,000 SY of 1" thick milling, removal and disposal of existing asphalt pavement, 1,500 SY of 1" thick milling, removal and disposal of existing asphalt pavement, 15,000 SY of mill additional 1" thick asphalt pavement, remove and dispose after the first inch of milled pavement, 2,500 SY of sawcut,removal, and disposal of existing concrete sidewalk or slab up to 4" thick. See attached file.
Posted Date
Dec 5, 2025
Due Date
Jan 30, 2026
Release: Dec 5, 2025
Close: Jan 30, 2026
Work consist of 2,500 SY of saw cut, removal and disposal of asphalt pavement up to 2" thick, 1,000 SY of additional cost per 1" thickness after 2" to saw cut, remove and dispose of asphalt pavement, 15,000 SY of 1" thick milling, removal and disposal of existing asphalt pavement, 1,500 SY of 1" thick milling, removal and disposal of existing asphalt pavement, 15,000 SY of mill additional 1" thick asphalt pavement, remove and dispose after the first inch of milled pavement, 2,500 SY of sawcut,removal, and disposal of existing concrete sidewalk or slab up to 4" thick. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →