Summary
The major items of work consist of: 1. Temporary and permanent traffic control 2. Temporary and permanent erosion control 3. Grading complete: clearing and grubbing, grading 4. Roadside treatments: ditching, vegetation establishment 5. Drainage: storm-drain pipes and storm drainage structures 6. Subgrade and base preparation to include graded aggregate base 7. Asphalt placement: recycled asphalt concrete leveling and 19MM, 12.5 MM superpave 8. Concrete construction: sidewalks, ramps, valley gutter, curb & gutter, concrete base or widening 9. Pavement markings and permanent signs 10. Traffic signal: strain poles, mast arms, and signal heads.