Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Shadow pines southside shared use trail system professional design services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide surveying and engineering design services for preparation of design of a shared use path connection for approximately 0.9-mile (10-feet wide).
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Provide surveying and engineering design services for preparation of design of a shared use path connection for approximately 0.9-mile (10-feet wide).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailableProviding professional evaluation, design, and administrative services related to the implementation of permanent emergency generator systems.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Providing professional evaluation, design, and administrative services related to the implementation of permanent emergency generator systems.
AvailableDESIGN/BUILD: Design and construct the trail reroute behind the Water Treatment Plant. The project is to include 8' wide, 5' thick concrete trail with approximately 2,010 FT long, along with a footbridge. Trail will maintain a 75 FT buffer from the creek. Footbridge will consist of 60' x 8' wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
DESIGN/BUILD: Design and construct the trail reroute behind the Water Treatment Plant. The project is to include 8' wide, 5' thick concrete trail with approximately 2,010 FT long, along with a footbridge. Trail will maintain a 75 FT buffer from the creek. Footbridge will consist of 60' x 8' wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →