Wickson Creek Special Utility District
Alignment 1 is construction of a new 12 (Alternate 24 ) distribution water line approx. 5,600 LF, and removal of an existing 8" PVC water line along State Highway 30. Alignment 2 is construction of a new 12" distribution water line approx. 600 LF, and removal of an existing 8" PVC water line along State Highway 30.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cabot WaterWorks
The project generally consists of the construction of approx. 7,780 LF of 30" water line relocation.
Posted Date
Oct 26, 2025
Due Date
Dec 4, 2025
Release: Oct 26, 2025
Cabot WaterWorks
Close: Dec 4, 2025
The project generally consists of the construction of approx. 7,780 LF of 30" water line relocation.
AvailableCity of Paola
Water line relocation work includes 1,294 LF 16" C900 DR-14 water main; 36 LF 30" steel casing pipe; 1 Ea fire hydrant with water valve; 1 LS fittings; 2 Ea gate valve with box; 1 LS seeding; see attached bid ad.
Posted Date
Nov 14, 2025
Due Date
Dec 5, 2025
Release: Nov 14, 2025
City of Paola
Close: Dec 5, 2025
Water line relocation work includes 1,294 LF 16" C900 DR-14 water main; 36 LF 30" steel casing pipe; 1 Ea fire hydrant with water valve; 1 LS fittings; 2 Ea gate valve with box; 1 LS seeding; see attached bid ad.
AvailableOrange County Water Control And Improvement District 2
Project will consist, but is not limited to, boring a 12" steel casing under an existing railroad crossing and installing a 6" water line, including all connections to existing, valves, markers, casing vents, traffic control, storm water pollution prevention, and abandonment of existing pipe
Posted Date
Nov 16, 2025
Due Date
Dec 17, 2025
Release: Nov 16, 2025
Orange County Water Control And Improvement District 2
Close: Dec 17, 2025
Project will consist, but is not limited to, boring a 12" steel casing under an existing railroad crossing and installing a 6" water line, including all connections to existing, valves, markers, casing vents, traffic control, storm water pollution prevention, and abandonment of existing pipe
AvailableOklahoma Grand River Dam Authority
Provide feeder 42 line 354 relocation - hardware / material.
Posted Date
Nov 18, 2025
Due Date
Dec 11, 2025
Release: Nov 18, 2025
Oklahoma Grand River Dam Authority
Close: Dec 11, 2025
Provide feeder 42 line 354 relocation - hardware / material.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis