CountyOR
Posted
Nov 9, 2026
Dec 15, 2026
Westport Road Improvement Project RFP
Work consists of 220 SF Temporary Signs; 1 EA Temporary Curb Ramp; 5 EA Inlet Protection, Type 4; 10,000 SY Subgrade Geotextile; 200 FT 24" Culvert Pipe, 10 ft Depth; 500 FT 12" Storm Sewer Pipe, 5 ft Depth; 2 EA Concrete Inlets, Type G-2; 4,300 TN Level 3, 1/2" ACP Mixture; 1,720 SF Concrete Walks; 2,525 SF Midwest Guardrail System, Type 2A; 198 EA Bi-Directional Yellow Type 1AR Markers, Recessed.
