Summary
The new Ower DOT will provide live-fire and simulation training structures, classrooms, emergency medical service training facilities and onsite fire apparatus training. The new Owner DOT will have approximately 12 primary buildings, totaling approximately 147,531 gross SF. 58,432 SF of buildings will be Occupied Buildings (offices, classrooms, training and support buildings), while 53,134 square feet of buildings will be Unoccupied Training Structures (simulated buildings for fire and rescue training), while another 4,132 SF of buildings will be Campus Shared Spaces. There are two major sewer/stormwater infrastructure systems: an 18’-wide Box Culvert, and a 2'-6" by 3’-9" Sewer Main. Per draft agreements with the San Francisco Public Utilities Commission (SFPUC), these utilities cannot be built over and must be protected during construction (reference SFPUC MOU. Exhibits 7 - 12). Neighboring sites consist of: light industrial (PDR-2 zoned) to the north and west; recreational (state park lands) to the east; and residential across the street to the south (planned Five Point Development housing).