Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Includes the installation of approx., 3,800 LF of 8" force main, 23,000 LF 18" sanitary sewer pipe, sewer lift station, and related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx. 970 LF of removing existing pipe; 1 EA of removal of manhole; 1 LS of 16: AC pipeline replacement; 1,345 SY of wetland protection; 4 EA of Piezometer Abandonment; 1 LS removal of wingwall; 13 EA of pipeline plugging; 5,340 SY removal of Asphalt Mat(Full-Depth); 4,431 SY of excavation; 4,001 LF of 8" PVC Restrained Joint Force Main (DR-25 C900); 20 LF of 12" PVC Restrained Joint Force Main (DR-25 C900); 2 EA of 8" 11.25 Degree Restrained Bend (R>1.5D); 102 LF of 21" Gravity Sewer Pipe (SDR-35 PVC); 23,118 LF of 18" Gravity Sewer Pipe SDR-35 PVC; 28 EA of sewer service stub-out; 59 EA of 60" Sanitary Sewer Basic MH; 1 LS of Force Main Discharge Manhole; 590 VLF MH Coating; 3 EA of 60" Polymer Concrete MH; 8 EA of fence gate; 7,957 TN of 9" thick canal road surface; 884 TN of Hot Bituminous Pavement (3" Thick) (Grading SX, PG 64-22) (One 3" Lift); 1 LS of erosion control; Dust Abatement; 1 LS of bypass pumping; pavement markings; potholing; 1 LS Lift station; 24,250 TN of Sludge/Liner Disposal.
Posted Date
Dec 19, 2025
Due Date
Feb 4, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 4, 2026
Work includes approx. 970 LF of removing existing pipe; 1 EA of removal of manhole; 1 LS of 16: AC pipeline replacement; 1,345 SY of wetland protection; 4 EA of Piezometer Abandonment; 1 LS removal of wingwall; 13 EA of pipeline plugging; 5,340 SY removal of Asphalt Mat(Full-Depth); 4,431 SY of excavation; 4,001 LF of 8" PVC Restrained Joint Force Main (DR-25 C900); 20 LF of 12" PVC Restrained Joint Force Main (DR-25 C900); 2 EA of 8" 11.25 Degree Restrained Bend (R>1.5D); 102 LF of 21" Gravity Sewer Pipe (SDR-35 PVC); 23,118 LF of 18" Gravity Sewer Pipe SDR-35 PVC; 28 EA of sewer service stub-out; 59 EA of 60" Sanitary Sewer Basic MH; 1 LS of Force Main Discharge Manhole; 590 VLF MH Coating; 3 EA of 60" Polymer Concrete MH; 8 EA of fence gate; 7,957 TN of 9" thick canal road surface; 884 TN of Hot Bituminous Pavement (3" Thick) (Grading SX, PG 64-22) (One 3" Lift); 1 LS of erosion control; Dust Abatement; 1 LS of bypass pumping; pavement markings; potholing; 1 LS Lift station; 24,250 TN of Sludge/Liner Disposal.
AvailableThe project consists of installation of a package plant and approx. 900 LF of sewer main and electric updates of an onsite sewer facility.
Posted Date
Jan 3, 2026
Due Date
Jan 19, 2026
Release: Jan 3, 2026
Close: Jan 19, 2026
The project consists of installation of a package plant and approx. 900 LF of sewer main and electric updates of an onsite sewer facility.
AvailableConstruction includes: installation of an 8" main line master meter and electric control valve assembly at the route 89/maple grove church road intersection; installation of a 6" main line master meter and electric control valve assembly on oak grove church road; replacement of approx 74 existing water service meters.
Posted Date
Dec 17, 2025
Due Date
Jan 20, 2026
Release: Dec 17, 2025
Close: Jan 20, 2026
Construction includes: installation of an 8" main line master meter and electric control valve assembly at the route 89/maple grove church road intersection; installation of a 6" main line master meter and electric control valve assembly on oak grove church road; replacement of approx 74 existing water service meters.
AvailableSeeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Foothills Regional Airport Industrial Sewer Project.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Seeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Foothills Regional Airport Industrial Sewer Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.