Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of replacement of approx., 10,300 LF of existing 8", 10", 12", and 18" diameter sanitary sewer lines with new PVC and dip sewer lines. The project will replace existing sewer lines with like-for-like sized pipelines and will not increase the current capacity.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Project consists of providing all required materials, equipment and labor necessary to complete the construction of the well house and treatment for the phase 5 water system improvements. Generally, the project includes the construction of remaining work on the issue for bid plans other than the well, well pump, and the 250,000 gallon elevated storage tank for county.
AvailableConstruction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality and Drainage Improvements
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Construction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality and Drainage Improvements
AvailableProcurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Procurement of construction services for Sanitary Sewer System Improvements and Wastewater Treatment Facility Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →