Summary
Work includes a lump-sum sewer line replacement. Any equipment, scaffolding, lifts or other equipment to be provided by contractor. Contractor shall barricade the area. Contractor shall provide a private underground utility locator to locate any underground private utilities if any. Contractors should use a ground penetrating radar to scan the area. Remove asphalt that’s needed and dispose of it. Excavate and backfill/tamp with same dirt. New piping and fittings shall be rated for SCH 80 PVC. Install a minimum of four (4) clean outs requests in drawing for new sewer line. Reconnect the existing two (2) 4" branch lines to the new 6".