Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes rehabilitation and improvements to the existing sewer system also included in the work is the replacement of a sewer main on street and associated drainage and roadway repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project consists of rehabilitating approx. 2,418 LF of gravity sewer mains by cured-in-place polyethylene liner installation, rehabilitating approx. 4,724 LF of gravity sewer mains by pipe bursting method, and rehabilitating approx. 259 sewer manholes throughout the sewer collection system.
Posted Date
-
Due Date
Jan 20, 2026
Close: Jan 20, 2026
This project consists of rehabilitating approx. 2,418 LF of gravity sewer mains by cured-in-place polyethylene liner installation, rehabilitating approx. 4,724 LF of gravity sewer mains by pipe bursting method, and rehabilitating approx. 259 sewer manholes throughout the sewer collection system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
North Charleston Sewer District is soliciting bids for Collection System Improvements that include cured‑in‑place pipe (CIPP) installation along the Ashley Interceptor and rehabilitation of existing manholes. The work includes approximately 5,329 linear feet of CIPP (about 577 LF of 42‑inch and 4,752 LF of 36‑inch gravity sewers) and rehabilitation of 25 manholes. A pre‑bid meeting is scheduled for January 29, 2026, and bids are due February 17, 2026 at 2:00 PM local time.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
North Charleston Sewer District is soliciting bids for Collection System Improvements that include cured‑in‑place pipe (CIPP) installation along the Ashley Interceptor and rehabilitation of existing manholes. The work includes approximately 5,329 linear feet of CIPP (about 577 LF of 42‑inch and 4,752 LF of 36‑inch gravity sewers) and rehabilitation of 25 manholes. A pre‑bid meeting is scheduled for January 29, 2026, and bids are due February 17, 2026 at 2:00 PM local time.
AvailableConstruction of sewage treatment plant improvements and sanitary sewer replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Construction of sewage treatment plant improvements and sanitary sewer replacement.
AvailableSite clearing, bypass pumping and site dewatering, construction of stone access driveways, installation of PVC sanitary sewer piping, concrete encasement of sanitary sewer piping, installation of sanitary manholes, removal of existing sanitary manhole and piping, abandonment of existing sanitary piping, and all other associated work.
Posted Date
Dec 30, 2025
Due Date
Jan 29, 2026
Release: Dec 30, 2025
Close: Jan 29, 2026
Site clearing, bypass pumping and site dewatering, construction of stone access driveways, installation of PVC sanitary sewer piping, concrete encasement of sanitary sewer piping, installation of sanitary manholes, removal of existing sanitary manhole and piping, abandonment of existing sanitary piping, and all other associated work.