Summary
Project includes 1 LS clearing and grubbing; 1 LS excavation and embankment, including pavement removal; 70 CY driveway replacement, type 2b; 560 CY asphalt concrete base, t=5"; 900 CY aggregate base, t=8"; 8032 GAL non tracking tack coat (0. 1 gal/sy); 140 CY asphalt concrete, surface course, type 1, (448), pg 64-22, t=1-1/4"; 1,560 LF concrete curb & gutter, per r-5 (continuous), t=6"; 530 SF concrete sidewalk, t=4", per r-9; 8,620 SF asphalt shared use path (sup), per r-20; 13 EA curb ramps - walk (w/ ADA detectable warning), per r-10a; 1 LS sedimentation and erosion control; 7 EA manhole, type c, per st-3, with concrete collar; 118 LF 6" ductile iron water pipe and fittings, with bedding and backfill.