Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Palm Beach County
Work includes drainage canal replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Sunrise
Work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, temporary steel sheet piling, dewatering, demolition and replacement of existing canal culvert pipe, street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping andexcavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, relocation of existing water main pipe, replacement of existing pvc gravity sewer main piping with ductile iron pipe, cutting into and connecting to existing street drainage pipe and canal culvert pipes, pavement milling and resurfacing, pavement markings, sodding.
Posted Date
Nov 10, 2025
Due Date
Dec 12, 2025
Release: Nov 10, 2025
City of Sunrise
Close: Dec 12, 2025
Work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, temporary steel sheet piling, dewatering, demolition and replacement of existing canal culvert pipe, street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping andexcavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, relocation of existing water main pipe, replacement of existing pvc gravity sewer main piping with ductile iron pipe, cutting into and connecting to existing street drainage pipe and canal culvert pipes, pavement milling and resurfacing, pavement markings, sodding.
AvailableLee County
Work includes bridge replacement and drainage improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 8, 2025
Release: Nov 7, 2025
Lee County
Close: Dec 8, 2025
Work includes bridge replacement and drainage improvements.
AvailableLee County
Work includes canal improvements.
Posted Date
Oct 28, 2025
Due Date
Dec 1, 2025
Release: Oct 28, 2025
Lee County
Close: Dec 1, 2025
Work includes canal improvements.
AvailableMinnesota Department of Transportation
Signal replacement, ADA, drainage and TMS.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
Minnesota Department of Transportation
Close: Dec 3, 2025
Signal replacement, ADA, drainage and TMS.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis