Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sunrise
Work includes sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, temporary steel sheet piling, dewatering, demolition and replacement of existing canal culvert pipe, street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping andexcavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, relocation of existing water main pipe, replacement of existing pvc gravity sewer main piping with ductile iron pipe, cutting into and connecting to existing street drainage pipe and canal culvert pipes, pavement milling and resurfacing, pavement markings, sodding.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Jerseyville
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
Posted Date
-
Due Date
Dec 17, 2025
City of Jerseyville
Close: Dec 17, 2025
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Coahoma County
Drainage improvements: 1. Removal and replacement of inlet drainage structures 2. Removal and replacement of concrete pipe and/or approved equal pipe materials 3. Removal and replacement of curb and gutter 4. Removal and replacement of asphalt pavement 5. Rehabilitation of soil, landscape, and grass at each inlet location 6. Removal and replacement of various city signs, i. E: stop, street, yield, etc
Posted Date
Oct 31, 2025
Due Date
Dec 4, 2025
Release: Oct 31, 2025
Coahoma County
Close: Dec 4, 2025
Drainage improvements: 1. Removal and replacement of inlet drainage structures 2. Removal and replacement of concrete pipe and/or approved equal pipe materials 3. Removal and replacement of curb and gutter 4. Removal and replacement of asphalt pavement 5. Rehabilitation of soil, landscape, and grass at each inlet location 6. Removal and replacement of various city signs, i. E: stop, street, yield, etc
AvailableBraden Development Corp
Cordova Hills Town Center Village Phase 1A Improvements.
Posted Date
May 2, 2025
Due Date
Dec 4, 2025
Release: May 2, 2025
Braden Development Corp
Close: Dec 4, 2025
Cordova Hills Town Center Village Phase 1A Improvements.
AvailableCity of Fair Grove
The City of Fair Grove, Missouri is requesting separate sealed bids for the S. Main Street Culvert Improvements project. Bids are due by 11:30 P.M. (Prevailing Local Time) on December 3, 2025, and include options for extending an existing box culvert or complete removal and replacement.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
City of Fair Grove
Close: Dec 4, 2025
The City of Fair Grove, Missouri is requesting separate sealed bids for the S. Main Street Culvert Improvements project. Bids are due by 11:30 P.M. (Prevailing Local Time) on December 3, 2025, and include options for extending an existing box culvert or complete removal and replacement.
Available