Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of South Burlington
The work generally consists of a stand-alone one-story 43,000+/- SF pre-engineered metal building located at the Northwest corner of the airport property along Airport Parkway. This location will provide direct access to the primary taxiway and will be fully within the secure perimeter of the airport. The building will house parking spaces for 23 vehicles, including Multi-Task Equipment (MTE), plows, blowers, and loaders, as well as office and support spaces for airport maintenance staff. The new site will also have a new fuel island and separate material storage building to hold sand and runway de-icing materials.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Burlington International Airport
The Patrick Leahy Burlington International Airport is soliciting bids for construction of a Snow Removal Equipment (SRE) Building in South Burlington, Vermont. Proposals are due by December 30, 2025 at 10:00 AM local time.
Posted Date
-
Due Date
Dec 30, 2025
Burlington International Airport
Close: Dec 30, 2025
The Patrick Leahy Burlington International Airport is soliciting bids for construction of a Snow Removal Equipment (SRE) Building in South Burlington, Vermont. Proposals are due by December 30, 2025 at 10:00 AM local time.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Burlington
The Patrick Leahy Burlington International Airport seeks proposals for constructing a 43,000 sq ft pre-engineered metal building for snow removal equipment, including parking for 23 vehicles, office spaces, a fuel island, and a material storage building. The project requires compliance with federal and state wage rates, bonding, insurance, and DBE participation. Bidders must be pre-qualified with the City of Burlington.
Posted Date
-
Due Date
Dec 30, 2025
Release: -
City of Burlington
Close: Dec 30, 2025
The Patrick Leahy Burlington International Airport seeks proposals for constructing a 43,000 sq ft pre-engineered metal building for snow removal equipment, including parking for 23 vehicles, office spaces, a fuel island, and a material storage building. The project requires compliance with federal and state wage rates, bonding, insurance, and DBE participation. Bidders must be pre-qualified with the City of Burlington.
AvailableUnited States Department of Veterans Affairs Police Department
This contractor will provide all supervision, labor, tools, equipment, materials, fuel and plant necessary to remove snow on walkways, stairs, ramps, landings, building entrances, pad mount generators access, siamese connections, fire hydrants, roads, perimeter sidewalks and parking garages, treat surfaces, load piles of snow and transport to a snow dump.
Posted Date
Dec 1, 2025
Due Date
Dec 5, 2025
Release: Dec 1, 2025
United States Department of Veterans Affairs Police Department
Close: Dec 5, 2025
This contractor will provide all supervision, labor, tools, equipment, materials, fuel and plant necessary to remove snow on walkways, stairs, ramps, landings, building entrances, pad mount generators access, siamese connections, fire hydrants, roads, perimeter sidewalks and parking garages, treat surfaces, load piles of snow and transport to a snow dump.
AvailableAusable Forks Volunteer Fire Department
Snow removal.
Posted Date
Nov 16, 2025
Due Date
Dec 10, 2025
Release: Nov 16, 2025
Ausable Forks Volunteer Fire Department
Close: Dec 10, 2025
Snow removal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →