Summary
Security upgrades at the cross bay bridge and marine parkway bridge. Drill and grout anchor bolts. Install tower structural steelwork using steel located at Marine Parkway Bridge. Test existing light fixtures and panelboards. Excavate, install conduits with drag lines and back fill. Install conduits in the towers. Install foundations and supports for cabinets. Install panel boards and cabinets for electrical and security systems. Install wiring and fiber for lighting and security systems. Commission electrical, lighting and security systems.
Modify existing AVI cabinet platforms and relocate the existing canopy
and guardrails.