Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The owner is seeking a complete end-to-end and fully functional data infrastructure for our science building on our main campus. Network switches, phone systems, wireless access points, and end point devices are not to be considered as part of the data infrastructure. All hardware, racks, patch panels, patch cords, and supplies are to be provided, installed, and tested, to be made fully operational. Test results must be supplied for each building individually before final inspection of completion.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide research to develop a compendium to help state dots collaborate with utility providers to integrate property interest information with existing utility infrastructure data. At a minimum, the compendium shall include a data governance framework, a technical architecture for linking existing utility facility data to its associated property interest, a spatial data framework holding the linked information, and implementation guidance.
Posted Date
Jan 7, 2026
Due Date
Feb 19, 2026
Release: Jan 7, 2026
Close: Feb 19, 2026
Provide research to develop a compendium to help state dots collaborate with utility providers to integrate property interest information with existing utility infrastructure data. At a minimum, the compendium shall include a data governance framework, a technical architecture for linking existing utility facility data to its associated property interest, a spatial data framework holding the linked information, and implementation guidance.
AvailableColumbia Public Schools is soliciting sealed bids for upgrades to the data center at the Aslin Administration Building. A mandatory pre-bid meeting is scheduled for January 28, 2026, at 10:00 a.m. at the Aslin building. Bid proposals are due February 5, 2026, at 2:00 p.m. CST; project documents are available through American Document Solutions after January 14, 2026.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Columbia Public Schools is soliciting sealed bids for upgrades to the data center at the Aslin Administration Building. A mandatory pre-bid meeting is scheduled for January 28, 2026, at 10:00 a.m. at the Aslin building. Bid proposals are due February 5, 2026, at 2:00 p.m. CST; project documents are available through American Document Solutions after January 14, 2026.
Installing a structured cabling and fiber system at library. The project includes running new fiber optic cabling between the main and intermediate distribution frames, installing approx 275 cat6a data drops throughout the facility, utilizing and expanding existing cable pathways, and providing thorough labeling and documentation of all installed components.
Posted Date
Jan 2, 2026
Due Date
Feb 2, 2026
Release: Jan 2, 2026
Close: Feb 2, 2026
Installing a structured cabling and fiber system at library. The project includes running new fiber optic cabling between the main and intermediate distribution frames, installing approx 275 cat6a data drops throughout the facility, utilizing and expanding existing cable pathways, and providing thorough labeling and documentation of all installed components.
Provide a district-wide advanced metering infrastructure (ami) deployment solution, including provision of an ami data collection network with district-wide coverage, supply of ami compatible water meters and registers, the supply of ami radio transmitters for all district accounts, and provision of a fully functional ami meter data collection software, analysis and meter data management solution.
Posted Date
Dec 8, 2025
Due Date
Feb 9, 2026
Release: Dec 8, 2025
Close: Feb 9, 2026
Provide a district-wide advanced metering infrastructure (ami) deployment solution, including provision of an ami data collection network with district-wide coverage, supply of ami compatible water meters and registers, the supply of ami radio transmitters for all district accounts, and provision of a fully functional ami meter data collection software, analysis and meter data management solution.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis