Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
GoTriangle
Provide fiber-based internet services, minimum of 1 gbps symmetrical for the current, and any additional sites.
Posted Date
Mar 26, 2026
Due Date
Apr 30, 2026
Release: Mar 26, 2026
GoTriangle
Close: Apr 30, 2026
Provide fiber-based internet services, minimum of 1 gbps symmetrical for the current, and any additional sites.
AvailableGoTriangle
Project includes site amenity and improvements to bus stops. The work shall consist of clearing, grading, concrete pads and sidewalks, installing amenities, traffic control, and other related items. Removal of existing benches, curb and gutter, sidewalk, asphalt pavement, pipes, trimming of trees, trees and bushes within the construction limits, amenities are included in this work. Removal of additional concrete curbs, sidewalks, or other structures.
Posted Date
Feb 24, 2026
Due Date
Mar 12, 2026
Release: Feb 24, 2026
GoTriangle
Close: Mar 12, 2026
Project includes site amenity and improvements to bus stops. The work shall consist of clearing, grading, concrete pads and sidewalks, installing amenities, traffic control, and other related items. Removal of existing benches, curb and gutter, sidewalk, asphalt pavement, pipes, trimming of trees, trees and bushes within the construction limits, amenities are included in this work. Removal of additional concrete curbs, sidewalks, or other structures.
GoTriangle
Project includes electric vehicle charging stations. Work includes approx 1 LS clearing and grubbing; 1 LS electrical copper wire; 4 EA 100AF disconnect; 1 LS seeding.
Posted Date
-
Due Date
Mar 3, 2026
Release: -
GoTriangle
Close: Mar 3, 2026
Project includes electric vehicle charging stations. Work includes approx 1 LS clearing and grubbing; 1 LS electrical copper wire; 4 EA 100AF disconnect; 1 LS seeding.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track GoTriangle's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database