Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of approx 14,206 SY of 7" concrete parking lot pavement with curb. In addition, site grading, storm sewer pipe, curb inlets, storm sewer manholes, site lighting, and seeding will be part of the project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Consists of the Thompson Nursery Road extension. The limits of construction begin at SR 540 and US 17 and extend 1.9 miles to the southeast and ends south of Rifle Range Road (CR 655) and Eloise Loop Rd. Drainage; flexible paving; grading; guardrail; pavement marking; roadway signing; traffic signal; hot plant-mixed bituminous courses; electrical work; and sidewalk.
Posted Date
Nov 21, 2025
Due Date
Jan 21, 2026
Release: Nov 21, 2025
Close: Jan 21, 2026
Consists of the Thompson Nursery Road extension. The limits of construction begin at SR 540 and US 17 and extend 1.9 miles to the southeast and ends south of Rifle Range Road (CR 655) and Eloise Loop Rd. Drainage; flexible paving; grading; guardrail; pavement marking; roadway signing; traffic signal; hot plant-mixed bituminous courses; electrical work; and sidewalk.
Premium
Access the largest public sector contact database
The City of Rancho Cordova Public Works Department is soliciting bids for the Mather Field Road Enhancements Project Phase 1, which includes new sidewalk improvements, ADA-compliant curb ramps, installation of a pergola, resurfacing of an existing soundwall, and associated landscape enhancements. The total construction estimate is $1.3 million with an anticipated construction duration of 40 working days. All bids, Q&A, addenda, and submissions will be posted and accepted online through the Citys procurement portal.
Posted Date
Nov 21, 2025
Due Date
Dec 17, 2025
Release: Nov 21, 2025
Close: Dec 17, 2025
The City of Rancho Cordova Public Works Department is soliciting bids for the Mather Field Road Enhancements Project Phase 1, which includes new sidewalk improvements, ADA-compliant curb ramps, installation of a pergola, resurfacing of an existing soundwall, and associated landscape enhancements. The total construction estimate is $1.3 million with an anticipated construction duration of 40 working days. All bids, Q&A, addenda, and submissions will be posted and accepted online through the Citys procurement portal.
AvailableRelease: Nov 28, 2025
Close: Dec 18, 2025
Work includes road improvements.
AvailableProject includes Union Passenger Terminal – Phase II Parking Improvement Project.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Project includes Union Passenger Terminal – Phase II Parking Improvement Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis