Summary
Work includes unclassified excavation 399.000 CY, borrow excavation 1,604.000 CY, maintenance stone 98.810 Ton, liquid asphalt binder pg64-22 362.290 Ton, full depth asph pav patching 8" unif 9,880.640 SY, milling existing asphalt pavement 2.0" 65,870.930 SY, milling existing asphalt pavement (variable) 2,535.000 SY, asphalt surface course type b 6,587.000 Ton, driveway paving-surface type d 498.750 Ton, traffic control, permanent construction signs (ground mounted) 664.000 SF, 4" white broken lines (gaps excluded) fast dry paint 1,725.000 LF, 4" white solid lines (pvt edge lines) fast dry paint 123,235.200 LF. See attached bid ad.