Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes of curb, gutter, sidewalk, and drainage improvements approximately 3750 linear feet. The road must be open to traffic at all times during construction. Utilities may be present along specific routes. The contractor will coordinate with the local utility providers and make the necessary adjustments. All road work is to be performed within the existing or obtained rightof-way of the road and construction easements. 130 cy unclassified excavation; 1930 cy borrow excavation; 1400 cy muck excavation; 100 ton maintenance stone; 11 ton liquid asphalt binder pg64-22; 520 sy milling existing asphalt pavement 2. 0"; 70 ton asphalt base course - type b; 50 ton asphalt intermediate course type c. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Colleton County is seeking qualified firms to provide construction engineering and inspection (CE&I) services, including on-site inspections and testing, for the SC 303 Sidewalk Project and SCDOT Asphalt Resurfacing.
Posted Date
-
Due Date
Feb 19, 2026
Close: Feb 19, 2026
Colleton County is seeking qualified firms to provide construction engineering and inspection (CE&I) services, including on-site inspections and testing, for the SC 303 Sidewalk Project and SCDOT Asphalt Resurfacing.
AvailableSidewalk project.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Sidewalk project.
AvailableSidewalk Project.
Posted Date
Jan 6, 2026
Due Date
Feb 26, 2026
Release: Jan 6, 2026
Close: Feb 26, 2026
Sidewalk Project.
AvailableThe project includes approximately 395 SY of concrete sidewalk, including two (2) ADA ramps.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
The project includes approximately 395 SY of concrete sidewalk, including two (2) ADA ramps.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis