Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the demolition of the existing wastewater pumping station and generator; installation of building footing; installation of building; installation of submersible pumps, davit, standby generator, station plumbing, and controls; repair and coating of existing wetwells; installation of new wetwell hatch with safety measures/fall protection; reconnection to the existing forcemain; and rehabilitation and replacement of a sewer manhole.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Sewer pump station maintenance.
Posted Date
Jun 19, 2025
Due Date
Dec 18, 2025
Release: Jun 19, 2025
Close: Dec 18, 2025
Sewer pump station maintenance.
AvailableProvide engineering services for design and construction administration of a system wide pump station telemetry upgrade project.
Posted Date
Nov 25, 2025
Due Date
Jan 14, 2026
Release: Nov 25, 2025
Close: Jan 14, 2026
Provide engineering services for design and construction administration of a system wide pump station telemetry upgrade project.
AvailableMajor Items of work include: 1. Sewer Lift Station Rehabilitation - 4 EA; 2. Pumping Equipment Rehabilitation - 4 EA; 3. Structural Concrete - 7 CY.; 4. Generators - 2 EA.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Major Items of work include: 1. Sewer Lift Station Rehabilitation - 4 EA; 2. Pumping Equipment Rehabilitation - 4 EA; 3. Structural Concrete - 7 CY.; 4. Generators - 2 EA.
AvailableLump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Lump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis