Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of Edgewater Park
Sewer pump station maintenance.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Township of Long Beach
Sewer pump and storm water pump stations: emergency response and preventive maintenance program. Includes: 1. Check condition of control enclosure. 2. Check electrical conditions of insulation on power cable and all phases of motor windings. 3. Check for any loose or faulty electrical connections at splice box or control, conditions of pump cable. 4. Test control voltage, supply transformer. 5. Test seal fail module. 6. Test Mini-CAS and submeg relays. 7. Check conditions of control wiring. 8. Check control contacts. 9. Check voltage supply on line side of control panel; pump off. 10. Check voltage on load side of control panel; pump on. 11. Check amperage draw of pump motor. 12. Check upper shaft seals, condition of stator housing and listen for bearing noise. 13. Check thermals and leak sensors, if so required. 14. Check lower shaft seals; change oil, if necessary. 15. Check impeller for wear; re-torque, if necessary. 16. Check wear rings. 17. Test mix flush valve. 18. Check discharge connection for leaks. 19. Check operation of check valve. 20. Check operation of gate valve. 21. Clean and test level sensors. 22. Check alarm functions, if required. 23. Check generator transfer, if required. 24. Reset control to automatic operation. 25. Provide complete report on inspection of each pump and control. Estimate repairs, if possible, repair in field.
Posted Date
Nov 26, 2025
Due Date
Dec 11, 2025
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Release: Nov 26, 2025
Township of Long Beach
Close: Dec 11, 2025
Sewer pump and storm water pump stations: emergency response and preventive maintenance program. Includes: 1. Check condition of control enclosure. 2. Check electrical conditions of insulation on power cable and all phases of motor windings. 3. Check for any loose or faulty electrical connections at splice box or control, conditions of pump cable. 4. Test control voltage, supply transformer. 5. Test seal fail module. 6. Test Mini-CAS and submeg relays. 7. Check conditions of control wiring. 8. Check control contacts. 9. Check voltage supply on line side of control panel; pump off. 10. Check voltage on load side of control panel; pump on. 11. Check amperage draw of pump motor. 12. Check upper shaft seals, condition of stator housing and listen for bearing noise. 13. Check thermals and leak sensors, if so required. 14. Check lower shaft seals; change oil, if necessary. 15. Check impeller for wear; re-torque, if necessary. 16. Check wear rings. 17. Test mix flush valve. 18. Check discharge connection for leaks. 19. Check operation of check valve. 20. Check operation of gate valve. 21. Clean and test level sensors. 22. Check alarm functions, if required. 23. Check generator transfer, if required. 24. Reset control to automatic operation. 25. Provide complete report on inspection of each pump and control. Estimate repairs, if possible, repair in field.
AvailableGeorgia Ports Authority, Engineering and Maintenance Dept.
Perform lift station maintenance.
Posted Date
Nov 21, 2025
Due Date
Dec 10, 2025
Release: Nov 21, 2025
Georgia Ports Authority, Engineering and Maintenance Dept.
Close: Dec 10, 2025
Perform lift station maintenance.
AvailableCity of Hazlehurst
Construction of: Removal of pumps, piping and appurtenances from the Pumping Station and insertions of a new fiber reinforced polymer wetwell and new pumps, piping, valves, and appurtenances for the rehabilitation of the pumping station. Installation of a new 100-gpm sewage pumping, with approximately 56 LF of 4" force main. Installation of approximately 2,073 LF of 8" gravity sewer and 8 manholes, and abandonment of existing sewer manholes and the Pumping Station.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
City of Hazlehurst
Close: Dec 18, 2025
Construction of: Removal of pumps, piping and appurtenances from the Pumping Station and insertions of a new fiber reinforced polymer wetwell and new pumps, piping, valves, and appurtenances for the rehabilitation of the pumping station. Installation of a new 100-gpm sewage pumping, with approximately 56 LF of 4" force main. Installation of approximately 2,073 LF of 8" gravity sewer and 8 manholes, and abandonment of existing sewer manholes and the Pumping Station.
AvailableCity of Hazlehurst
Construction of: Removal of pumps, piping and appurtenances from the Pumping Station and insertions of a new fiber reinforced polymer wetwell and new pumps, piping, valves, and appurtenances for the rehabilitation of the pumping station. Installation of a new 100-gpm sewage pumping, with approximately 56 LF of 4" force main. Installation of approximately 2,073 LF of 8" gravity sewer and 8 manholes, and abandonment of existing sewer manholes and the Pumping Station.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
City of Hazlehurst
Close: Dec 18, 2025
Construction of: Removal of pumps, piping and appurtenances from the Pumping Station and insertions of a new fiber reinforced polymer wetwell and new pumps, piping, valves, and appurtenances for the rehabilitation of the pumping station. Installation of a new 100-gpm sewage pumping, with approximately 56 LF of 4" force main. Installation of approximately 2,073 LF of 8" gravity sewer and 8 manholes, and abandonment of existing sewer manholes and the Pumping Station.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →