Summary
Work includes construction of lane roadway and utility improvements 2,035 LF approx 1,200 LF; 250 LF the construction consists of approx 8,200 SY of pcc pavement, 2,200 LF of water main, 3,300 LF of storm sewer, 1,700 LF of sanitary sewer, subgrade preparation, modified subbase, manholes, intakes, sidewalk and shared use path paving, and other associated work; construction of roadway and utility improvements from the southern terminus of the base bid work to a point 807 LF to the south. The construction consists of approx 2,900 SY of pcc pavement, 900 LF of water main, 730 LF of storm sewer, subgrade preparation, modified subbase, manholes, intakes, sidewalk and shared use path paving, and other associated work. See outside link.