Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Works include approx. 1,797 LF of 8" DIP; 6 EA fire hydrant; 1,200 TN hot mix asphalt (grading SX) (75) (PG 58-28); 50 LF of 8" DIP (Restrained Joint). See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Premium
Access the largest public sector contact database
Watermain lining and replacement of watermain. The work will also include: watermain lining of 12", 10", 8" and 6" ductile iron watermain. Replacement of 6 "watermain with new 8" di watermain. Replacement of all service b-boxes. Replacement of all existing hydrants with new ej hydrants. Replacement of all existing valves with new rw valves. New service lines on the woburn ct where main is being replaced. Four (4) full service line replacements from b-box to meter near crystal tree subdivision. Replacement of storm pipe with watermain quality pipe at various crossings. Curb replacement. Sidewalk replacement. Asphalt replacement. Sod restoration. Possible road closure and detour signage and planning.
Work includes 20' 6" water main removed; 30 SY type "c" pavement replacement (asphalt), roadway; 10' curb, type 4-c, including removal; 825' 8" conduit, horizontal directional drilling without casing; 1 LS maintaining traffic; 2 EA connect new water main to existing water main; 20' 6" water main ductile iron pipe ansi class 52, mechanical joints and fittings; 100' 16" steel pipe encasement, bored or jacked; 1 EA 6" gate valve and valve box; 2 EA 8" gate valve and valve box; 1 EA 6" fire hydrant assembly, including 6" valve and valve box. See attached file.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Work includes 20' 6" water main removed; 30 SY type "c" pavement replacement (asphalt), roadway; 10' curb, type 4-c, including removal; 825' 8" conduit, horizontal directional drilling without casing; 1 LS maintaining traffic; 2 EA connect new water main to existing water main; 20' 6" water main ductile iron pipe ansi class 52, mechanical joints and fittings; 100' 16" steel pipe encasement, bored or jacked; 1 EA 6" gate valve and valve box; 2 EA 8" gate valve and valve box; 1 EA 6" fire hydrant assembly, including 6" valve and valve box. See attached file.
AvailableThe Cape Fear Public Utility Authority is soliciting bids for the River Road Booster Pump Station & Waterline Interconnect project, which involves construction of a water booster pump station and installation of a waterline interconnect including pipe installation, fittings, valves, and erosion/sediment control. The procurement is an Invitation for Bid with a total base bid range reported on the aggregator between approximately $4,405,925.00 and $5,700,000.00 and an AI-estimated budget of $4,000,000 – $6,000,000. Contractors are required to submit a lump sum bid with unit price items and allowances and to follow documentation available from the buyer site linked from the aggregator.
Posted Date
Dec 4, 2025
Due Date
Jan 4, 2026
Release: Dec 4, 2025
Close: Jan 4, 2026
The Cape Fear Public Utility Authority is soliciting bids for the River Road Booster Pump Station & Waterline Interconnect project, which involves construction of a water booster pump station and installation of a waterline interconnect including pipe installation, fittings, valves, and erosion/sediment control. The procurement is an Invitation for Bid with a total base bid range reported on the aggregator between approximately $4,405,925.00 and $5,700,000.00 and an AI-estimated budget of $4,000,000 – $6,000,000. Contractors are required to submit a lump sum bid with unit price items and allowances and to follow documentation available from the buyer site linked from the aggregator.
AvailableThe work includes the replacement of three (3) pressure reducing valve vaults in The Woods water system, including mechanical work, grading, and pavement and site restoration.
Posted Date
Nov 5, 2025
Due Date
Feb 11, 2026
Release: Nov 5, 2025
Close: Feb 11, 2026
The work includes the replacement of three (3) pressure reducing valve vaults in The Woods water system, including mechanical work, grading, and pavement and site restoration.